Skip to content
RT
⚠ Simulator outputs are scenario-based projections, not forecasts. All results depend on model assumptions. View assumptions · Reproducibility policy
Provenance:Dataset:TEIAS v2025.1Model:TIMES v1.0Run:5 Nov 2026sig_a417acfad709Seeded

Nuclear Hybrid

Semantic signature: sig_a417acfad709 · Derived from experiment: rl_ppo_20251127_114523

Edit in Builder →

Interpretation Guardrail

These results are scenario-based projections, not forecasts. They reflect model assumptions about technology costs, policy choices, and demand trajectories. Actual outcomes will differ. Always consult the full methodology and assumption registry before drawing policy conclusions.

Scenario Metrics

MetricThis ScenarioBaseline
Total System Cost490.1 bn TL532.4 bn TL
Cost Reduction vs Baseline−15.5%0%
CO₂ Reduction−36.7 Mtpa0 Mtpa
Renewable Share (actual)55%45.61%
Avg. Electricity Price279 TL/MWh253 TL/MWh
Peak Reserve Margin56.2%40%
Jobs Created+115k—
Storage Utilization47%39%

Feasibility

✅Feasible — Score: 100/100

Input Parameters

Renewable Share 2035
55%
Solar Capacity
35 GW
Wind Capacity
28 GW
Carbon Price
400 TL/tCO₂
Coal Phase-out
2040
Demand Growth
baseline
Efficiency Boost
8%
Grid Flexibility
moderate
Battery Storage
20 GWh
Nuclear
4.8 GW
🗺 Regional Map⚖ Compare with Baseline↓ Export Results

📎 Cite this — Nuclear Hybrid

Önderol, S. (2025). Scenario run: Nuclear Hybrid. Retrieved from https://renewabletransition.org/simulator/run/preview-nuclear-hybrid
Turkey Energy Transition Simulator | Renewable Transition